九九福利影院-九九大香尹人视频免费-九九成人免费视频-九九草在线观看-九九爱这里只有精品-九九爱精品

12 MWh Manzanares Battery Storage Equipment Supply

   2025-07-16
核心提示:Tender Notice for the BESS Manzanares Supply (Tend

Tender Notice for the BESS Manzanares Supply

(Tender No. IA2025210000007、SPROC2025071500000002)

1. Tender Conditions

China Three Gorges Spain S.L.U. is planning to install a 6MW*2h Battery Energy Storage System (BESS) at its exiting Manzanares Solar PV plant in Spain. The Scope of this Request for Proposal (RFP) is the equipment supply for the BESS Manzanares and now is open for public bidding.

Tenderee: China Three Gorges Spain S.L.U. (CTGS).

Tendering Agent: China Three Gorges International Tendering Co., Ltd.

Project Funds: Tenderee’s own funds.

Procurement Method: International Open Competitive Bidding.

*Important Note: Bidder only has one chance to submit the proposal, and all the materials shall be prepared and submitted as per the RFP requirements.

2. Project Overview and Tender Scope

2.1 Project Overview

The individual Manzanares Solar PV power plants Azuer I PV plant and Azuer II PV plant are located in Ciudad Real, a province in Spain, with installed capacities of 49.89 MWp and 39.09 MWp, respectively. They share a common step-up substation and grid connection point, with a total grid access capacity of 75 MW. The PV plants were commissioned and began generating electricity in late December 2021.

The step-up substation includes a reserved switchgear bay. The proposed site for installing the energy storage system is flat and adjacent to the substation, offering optimal conditions for deployment of battery energy storage facility. The energy storage system will be connected via a medium-voltage underground cable to the existing SET AZUER 220/30 kV substation, shared with the Azuer I solar PV plant. Additionally, the Azuer II PV plant also injects power through this substation. The SET AZUER substation connects to the Manzanares 220 kV A.I.E. collector substation (solar hub), located approximately 20 km away, via a 220 kV transmission line. From there, it links to the Spanish national grid (REE) via an existing 220 kV overhead line, terminating at the Manzanares 220 kV substation, which serves as the final Point of Interconnection (POI) to the grid.

The complete scope of work for the whole energy storage system includes system design and equipment supply, civil works, construction of internal and external access roads, fencing installation, electrical interconnections, communication and control interfaces, and installation of all required auxiliary systems, etc.

CTGS places significant importance on hybridizing BESS with the existing Manzanares Solar PV plants to conduct research on its asset value improvement and how to maximize the company’s return on investment. For the first step, CTGS will conduct a 6MW*2h BESS hybridized with Azure I PV plant as a pilot and scientific Research and Development (R&D) project to understand the key technologies, operations and income mechanism of energy storage plants in Spain. The key research points for this R&D project include: implementation of BESS demonstration project, economic analysis of hybridized BESS with PV plant, key technologies and testing & commissioning of BESS, and BESS connection with grid and its operation, etc.

This RFP focuses on the BESS equipment supply and requires the bidders (integrators) to optimize the installed power and energy capacity to comply with the following reference requirements:

Parameter

Requirements

Installed Power (MW)

6 MW

Total Energy Capacity (MWh)

12 MWh

Usable Energy (MWh) at POI at BOL

Minimum – 10,6 MWh

Usable Energy (MWh) at POI at year 20

Minimum – 6,3 MWh

RTE (BOL) at POI (%)

>85%

RTE (at year 20) at POI (%)

>83%

Availability

≥98% including scheduled and unscheduled outages

Auxiliary consumption

<2% of the Usable Energy

DoD range

100%

Average cycling/day

1,5 equivalent cycles/day

Charge/Discharge Method

CP/CP

2.2 Tender Scope

The scope of works for the BESS Manzanares equipment supply shall at least include the following and other relevant necessary works:

  1. Design, sizing and engineering of the BESS
  2. BESS Main Equipment Supply
  3. Spare Parts, consumables and Special Tools
  4. Factory Acceptance Test
  5. Transport (DDP, Incoterms 2020)
  6. Installation supervision
  7. Commissioning
  8. Product warranties
  9. Performance guarantees (capacity, power and availability)
  10. Maintenance under a Long Term Serves Agreement (LTSA)
  11. Provision of R&D assistance, including technical support, guidance, and Q&A (relevant research areas include key grid access technologies for BESS in the Spanish power system, dispatching and operational strategies for photovoltaic and energy storage power plants, and critical commissioning technologies for energy storage facilities).

The following works shall not be included in the BESS Manzanares equipment supply scope:

  • Preparatory works
  • Infrastructure works and construction facilities
  • Grid connection
  • Civil works
  • Electrical equipment interconnections
  • Instrumentation and control (I&C) interconnections
  • Security system

The bidder's quotation or technical proposal shall also include a detailed testing and commissioning plan, specifying the proposed duration, team members, and relevant resources to be mobilized.

The detailed requirements and references can be found in the annexes. Please refer to the table below for the corresponding annex numbers and their contents:

Annex

Content

0

Supplier Registration, Tender (Quotation) Operation Manual

1

Instructions, Description and Preliminary Design of the Project

2

Minimum Functional Specification

3

Inspection & Tests on Completion and PAC

4

BESS Manzanares Supply Contract DRAFT (together with Appendix in Annex 4.1-4.5)

Annex 4.1 Appendix III Advance Payment bond

Annex 4.2 Appendix III Performance bond

Annex 4.3 Appendix III Warranty bond

Annex 4.4 Appendix IV Lien Waiver

Annex 4.5 Appendix V HSE OM Management Manual template

5

LTSA Specifications

6

Format of Bid Documents (together with some templates and format requirements in Annex 6.1 - 6.5)

Annex 6.1 Price Breakdown Sheet

Annex 6.2 Technical Datasheets

Annex 6.3 Project Planning and the Main Milestones

Annex 6.4 Compliance Commitment Letter

Annex 6.5 Bid Submission Checklist

3. Qualification Requirements

3.1 Qualification Conditions of Bidders

Bidders shall meet the following qualification conditions:

(1) Financial requirement: the bidder shall be in good financial condition (provide the financial statements for 2021, 2022, and 2023).

(2) Performance requirements (refer to the bidder or its parent company):

A. From 1 January 2017 to the bid Submission Deadline, the bidder or its parent company shall have BESS project-related experience and equipment supply ability, and shall have successfully implemented no fewer than six (6) BESS projects globally (either completed or under construction, and at least including the battery room/container and the power conversion and step-up system); AND

B. From 1 January 2022 to the Bidding Submission Deadline, the bidder or its parent company shall at least have three (3) BESS projects experience with each installed capacity over 10MWh successfully constructed and operating (based on the BESS project commissioning date and at least including the battery room/container and the power conversion and step-up system); OR from 1 January 2020 to the Bidding Submission Deadline, the bidder or its parent company shall have cumulatively completed BESS projects with a total capacity exceeding 50?MWh (based on the BESS project commissioning date and at least including the battery room/container and the power conversion and step-up system).

(3) Local presence requirement

The bidder must maintain a sufficient local presence to support the BESS business in Spain (shall provide relevant documents demonstrating its local capabilities):

  • Availability of spare parts warehouse located in Spain or in neighboring countries to ensure that transportation time from the warehouse to the site can be within 10 calendar days; AND
  • Local team in Spain should include professionals holding experience or certifications at least covering Battery, PCS, EMS, Commissioning and Maintenance.

4. Acquisition of Tender Documents

The tender documents will be published at 12:00 p.m. on July 16, 2025 (Local Spanish time, hereinafter referred to as CET). (the same as below).

The tender documents are only available in electronic form and are free of charge.

Potential bidders must complete registration through the China Three Gorges International ERP system on the ARIBA platform ( ad/selfRegistration),.The bidder will send the electronic bid documents to the ARIBA platform after the registration.

Bidders shall log into the ARIBA platform ( ) to download the tender documents. The ARIBA Platform User Manual for bidders is provided as an attachment to the tender documents (please refer to the Annex 0 for the user manual).

5. Submission of Bid Documents

The deadline for submission of bid documents (Bidding Submission Deadline, the same below) is August 18, 2025, at 12:00 p.m. CET.

The submission of bid documents shall be made online and bid documents shall be successfully submitted to ARIBA before the Bidding Submission Deadline. The tenderee shall not accept the bid documents submitted after the Bidding Submission Deadline.

6. Bid Opening Time

Bid Opening Time: same as the Bidding Submission Deadline.

7. Media for Bidding Announcements

The tender notice is officially published on the SAP Ariba platform ( ), China Three Gorges Europe's LinkedIn page (https://


未在中國電力招標采購網(www.dl-yggm.cn)上注冊會員的單位應先點擊注冊。登錄成功后的在 招標會員 區根據招標公告的相應說明獲取招標文件!
咨詢電話:010-51957458
手 機:18811547188
聯系人:李楊
QQ:1211306049
微信:Li18811547188
郵箱:1211306049@qq.com
來源:中國電力招標采購網
備注:欲購買招標文件的潛在投標人,注冊網站并繳納因特網技術及商務信息服務費后,查看項目業主,招標公告并下載資格預審范圍,資質要求,
招標清單,報名申請表等。為保證您能夠順利投標,具體要求及購買標書操作流程按會員區招標信息詳細內容為準。
編輯:ctg.com
 
異議收藏 0打賞 0
 
更多>同類國家電投
  • dlztb007
    加關注68
  • 招標馬上開始。。。
推薦圖文
最新招標國家電投
國家能源國家電投
網站首頁  |  密碼索回  |  服務說明  |  入網協議  |  銀行匯款  |  聯系方式  |  關于我們  |  用戶協議  |  隱私政策  |  版權聲明  |  網站地圖  |  排名推廣  |  網站留言  |  京ICP備12017752號-8  |  11010702002406號
 
主站蜘蛛池模板: 亚洲男人的性天堂 | 日韩免费精品 | 国产福利不卡一区二区三区 | 一区二区三区免费观看 | 国产精品国产三级国产普通话 | 动漫黄视频 | 久久99精品久久久久久久不卡 | 加勒比一道本综合 | 国产欧美一区二区三区免费看 | 亚洲福利在线播放 | 在线精品日韩一区二区三区 | 国产护士一级毛片高清 | 国产一级毛片a午夜一级毛片 | 免费在线观看黄 | 中文字幕日韩wm二在线看 | 中文字幕亚洲高清综合 | 69av导航| 日韩国产在线观看 | 中文字幕无线码一区二区三区 | 热re99久久国产精品 | 中文字幕一区二区三区 精品 | 99在线播放| 天天摸夜夜摸夜夜狠狠摸 | 四虎国产永久在线观看 | 国产免费久久精品99 | 午夜视频精品 | 精品资源 | 国产婷婷色 | 日韩色视频一区二区三区亚洲 | 91在线免费观看网站 | 亚洲最大成人 | 成年人网址在线观看 | 成人一区二区免费中文字幕 | 欧美日韩欧美日韩 | 三级在线观看国产 | 亚洲va老文色欧美黄大片人人 | 久久www免费人成高清 | 欧美a网站| 国产欧美日韩一区二区三区 | 亚洲毛片在线看 | 天天色天天综合 |